HUESKER Australia - Roads & Pavements Site Support Services

Conception Stage

Collaborating with asset owners, and other relevant stakeholders, to ensure site-specific solutions are used for the best outcomes.

Our range of solutions, specifically engineered to suit asphalt, concrete and spray seal pavements for both Airfield and Road/Highway applications are locally provided with uninterrupted manufacturing and stocking, allowing constant and immediate availability to service projects of all sizes across the country.

Design Stage

Working with consulting engineers and designers to ensure best performance, with an unmatched confidence based on over 45 years' demonstrated field performance and Research and Development in this specific area alone, by

  • achieving highest chemical and mechanical compatibility between the materials
  • fully addressing technical as well as practical aspects of pavement engineering and asphalt paving operations
  • Ability to significantly reduce whole of life costs and build more durable pavements through optimal designs in both
  1. New Construction
  2. Asphalt overlay rehabilitation of existing pavement structures to address rigid, composite and flexible pavements

Construction Stage

Collaborating with contractors to ensure best construction practices and optimum productivity are achieved:

  • Review of installation and staging plans
  • Training of project teams and installation crews prior to works on site
  • On-Site support by specialist HUESKER Engineers with substantial field expertise in reinforced asphalt and road construction to provide guidance.

Considerable Productivity Gains

With the utilisation of

  • Specialised HUESKER Installation Frames
  • Optimized configuration to suit the site, with multiple material and width options locally
  • Customized roll size options to take it one step further especially for airfield projects, up to 5m wide, min of 150m long
  • Optimized staging of works
  • A well planned construction through close co-operation with HUESKER